FHWA ELIGIBILITY LETTERS
NU-CABLE
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
HSA-10 | 1/22/2002 | Marion Steel Company | Acceptance of Mathematical Chart for Varying Spaces | |
|
8/30/2002 |
Marion Steel Company |
TL-3 Acceptance |
|
|
10/12/2005 |
Nucor Steel |
Alternative |
|
HSA-10 | 10/19/2005 | Nucor Steel Marion Inc. | Cable to w-beam transition | |
|
8/11/2006 |
Nucor Steel |
20 foot |
|
|
1/24/2008 |
Nucor Steel |
TL-4 Acceptance |
|
|
7/25/2006 |
Nucor Steel |
Use of |
|
|
12/9/2008 |
Nucor Steel |
Extended |
|
|
9/23/2009 |
Nucor Steel |
TL-4 20 |
|
|
7/27/2009 |
Nucor Steel |
Nu-Cable |
NU-CABLE End Treatments
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
CC-76 | 8/29/2002 | TTI | CRP Anchor System | |
CC-98 | 4/9/2007 | Armorflex Ltd. | International end terminal | |
CC-105 | 7/10/2009 | Armorflex Ltd. | Armorwire ATE-4 | |
CC-105A | 10/23/2009 | Armorflex Ltd. | Armorwire ATE-3 |
GUARDRAIL PRODUCTS
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
B-162 | 9/11/2007 | Nucor Steel Marion Inc. | NU-GUARD-27™ & NU-GUARD-31™ | |
B-162B | 6/27/2008 | Nucor Steel Marion Inc. | NU-GUARD-31™ TL-4 | |
B-185 | 12/8/2008 | Nucor Steel Marion Inc. | Blocked Out W-beam 27 to 31 inch Heights | |
B-186 | 8/3/2009 | Nucor Steel Marion Inc. | Nu-Guard-27™ Posts Mixed with Standard Strong Post Guardrail |
|
B-288 | 09/27/2017 | Nucor Steel Marion Inc. | NU-FLEX |
RIB-BAK U-channel Signpost & Delineators
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
|
6/15/1987 |
Marion Steel Company |
a. |
|
|
7/18/1996 |
Marion |
Redesigned |
|
|
7/18/1996 |
Marion |
Redesigned |
LAP SPLICE Breakaway System
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
|
8/31/1989 |
Marion |
Single |
|
|
10/2/1989 |
Marion |
Clarifies |
|
|
12/12/1991 |
Marion |
Permit |
|
|
12/27/1991 |
Marion |
Weak Soil |
|
|
7/18/1996 |
Marion |
Post Cross-Section |
|
|
9/14/1994 |
South |
Splicing |
|
|
07/13/1995 |
Marion |
3#/ft |
|
|
03/14/1996 |
Marion |
Lap Splice |
|
|
07/18/1996 |
Marion |
Post Cross-Section |
|
(Canadian) |
7/19/1999 |
Marion |
Modified |
SLIP-SAFE Breakaway System
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
|
9/18/1996 |
Safety |
U-Channel |
|
|
4/4/1997 |
Safety |
Slip Safe |
|
|
|
Marion |
Square |
SLIP-SAFE SUPREME Breakaway System
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
|
9/18/1996 |
Safety |
U-Channel |
|
|
4/4/1997 |
Safety |
Slip Safe |
BEND-BAK Delineators
PDF Link | Letter No. | Date | Company | Description |
---|---|---|---|---|
SS-42 |
11/10/1993 |
Marion Steel |
1.12 PPF and |